Sort by:[Date]

2008 Status Tables

Stephen noticed something peculiar in some spectra I sent him which led me to discover what looks like a problem in the status tables.

Calorimeter tower calibration history

 In preparation for the upcoming calorimeter calibration workshop, I wanted to organize a bit the history of past calorimeter calibration work.

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> Upsilon 400 series

I have switched to running over the upsilon 400 series for this analysis until the new embeded set is available.

pixel geometry - code changes

chain working in starnew (SL08d):

 

BFC:WARN  - StBFChain::Setup

QA :INFO  - ==============================================

BEMC Drawings (PDFs)

I obtained these drawings from John Scheblein. They give some details of the
Barrel components, but since they are assembly drawings, some dimensions such

PPV Revision 1.29 +low pt- high luminosity fmsslow trigger evaluation

daq files are at:

/star/data03/daq/2008/068/9068124f
 

MuDst files are at:

/star/data05/scratch/rjreed/PPV2008Eval/MuDstPt100fmshigh
 

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> L2 Trigger 2

From:

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> L0 Trigger

Ignoring the problems with the acceptance efficiency, I can still calculate trigger efficiencies.  The L0 trigger requirement is: a 3 tower cluster > 4 GeV.  In my code, I use the L2 s

Data Jet Distributions in Eta and Pt with Vertex Cut ( |vz| < 60 cm) for Fill 7847

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> Acceptance 2

Geometric acceptance was originally found to be much higher, ~0.5