- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Comparing Total and xnxn cross sections in STARlight
Updated on Wed, 2009-08-26 13:00. Originally created by sbutter on 2009-03-11 15:06.Comparing Total and xnxn cross sections in STARlight.
Plots are for p_t, rapidity, and mass.
Here is the link for pp event at LHC going into Y->mumu:
Preliminary EEMC Timing Curves by Crate + Individual Channels
Updated on Sat, 2009-03-14 14:40. Originally created by aliceb on 2009-03-11 14:19.Introduction
The following runs were taken for EEMC timing:
Test Entry
Updated on Mon, 2009-05-18 19:09. Originally created by testadmin on 2009-03-11 12:35.Test EntryUML generalization
ZDC polarimetry in p+p 500 GeV runs (fills 10305, 10307, 10308, and 10325)
Updated on Thu, 2010-01-07 19:17. Originally created by ogrebeny on 2009-03-10 19:59.Each PDF file has the phi dependence fit on the last page.
The beam polarization is taken from the CDEV monitoring job as a ratio rhic_pol->avgAsymXS / rhic_pol->analyzingPowerS.
Run9 BTOW HV Mapping Analysis - Summary
Updated on Tue, 2009-03-10 14:10. Originally created by seelej on 2009-03-10 14:08.This page outlines all the towers that have been swapped in the Run9 BTOW HV Mapping analysis (cellID->softID mapping).
Slides for A. Gordon (Moriond 2009)
Updated on Mon, 2009-03-09 17:02. Originally created by surrow on 2009-03-09 17:00.
Slides for A. Gordon's talk:
STAR Longitudinal Spin Program
Slide 1: STAR Gluon polarization measurements (ALL Inclusive Jets and Result from global analysis)
ZDC Analysis: Data Taken March 7-8
Updated on Tue, 2009-03-10 12:13. Originally created by aliceb on 2009-03-09 14:42.Introduction
Run9 BTOW HV Mapping Analysis - Part 2
Updated on Sun, 2009-03-08 21:55. Originally created by seelej on 2009-03-08 21:55.Because there was not enough statistics taken in the first mod7 data set to determine the other towers that are swapped, another set with softID%6 was taken in order to determine the rest of the to
BTOW timing runs 10065031-45
Updated on Thu, 2009-03-12 17:51. Originally created by aliceb on 2009-03-08 12:27.Introduction
The following runs were taken for BTOW timing:
QM09 Presentation
Updated on Sun, 2009-03-08 12:17. Originally created by bbiritz on 2009-03-08 12:17.Hi All,
You can find my QM 2009 talk attached. Feedback is sought after.
Thanks,
Bertrand