- My blog
- Post new blog entry
- Top bloggers
- Recent posts
QM09 proceeding
Updated on Sun, 2009-06-14 15:17. Originally created by bbiritz on 2009-06-14 15:17.Hi All,
Attached is my QM09 proceeding, comments are sought.
Apologies for the delay.
Bertrand
Comparison of conversion rates in MC to data, take 2
Updated on Sat, 2009-06-13 14:02. Originally created by jwebb on 2009-06-13 13:05.Abstract: We compare the conversion rate for simulated π0 events in the 1st radiator of the endcap to data. We find a conversion rate of 88% +/- 4% for the simulation, comp
chi2 of TPC tracks, 500 GeV pp
Updated on Mon, 2009-07-13 07:07. Originally created by balewski on 2009-06-13 05:28.This study shows chi2/DOF for best TPC tracks using current default BFC. (updated, June 2009)
Run 8 Pions - Vertex
Updated on Mon, 2009-06-22 15:18. Originally created by stevens4 on 2009-06-12 15:10.Vertex Distributions for minbias (MB) and etot-mb-l2 triggered events:
MIT/BNL Transfer Tests
Updated on Thu, 2009-06-11 11:50. Originally created by betan on 2009-06-11 11:47.The following graphs show the result of a small study on the transfer speeds between the MIT Tier2 cluster and stargrid01/stargrid02.
run9 500 GeV BTOW relative gains calibration
Updated on Wed, 2009-06-10 11:13. Originally created by seelej on 2009-06-10 11:07.The purpose of this analysis is to calculate the relative gains in the BTOW. The slopes of each individual tower was calculated by Justin according to the W-algo wiki using Scott's method.
Information on the NPE (past) analysis and path forward
Updated on Tue, 2009-06-23 12:03 by testadmin. Originally created by jeromel on 2009-06-09 16:28.Quick start
Topic Comparison of conversion rates in MC to data, take 1
Updated on Wed, 2009-06-10 12:18. Originally created by jwebb on 2009-06-09 12:23.Abstract: We compare the conversion rate for simulated π0 events in the 1st radiator of the endcap to data. We find a conversion rate of 90% +/- 2% for the simulation, compared with 91.5% +/- 0.3% for the data, where we count any signal w/in R<0.3 of the pion candidate as a conversion.Contents:2009 BSMD Status for 500 GeV Run
Updated on Wed, 2009-09-02 13:44. Originally created by wleight on 2009-06-08 20:50.The BSMD status analysis for the 500 GeV data proceeds in two steps. First, each strip is assigned a status for the whole run from an analysis of fills 10399, 10402, 10403, 10404, 10407, 1041
ZDC simulation with enhanced resoluton
Updated on Mon, 2009-06-08 15:10. Originally created by nkellams on 2009-06-08 15:09.I changed the simulation to be able to read out each SMD strip individually so there are 21 by 32 bins instead of 7 by 8. This required a new binning configuration so I created two; one