run 11 W preparation (take 1)
Various analysis in preparation of W measurement in 2011
- Tuning of the EEMC SF , Ilya
- MTD: 3 trays in run11 (geant tag MUTD04) , 117 trays in run 13 (geant tag MUTD05)
- PAC recommendation:
- 4 weeks ppTrans, assume 45% polarization, followed by
- 6 weeks ppLong. assume 50% polarization
- No pp2pp running during Run 11
- Background study vs. eta , based on run 9 data, - erased
- estimate of LT , FOM, eta slices - erased
Groups:
- balewski's blog
- Login or register to post comments